Houston Police Department South Gessner Division

Houston Police Department South Gessner Division

21. May 2012

Houston Police Department South Gessner Division
2011

Houston, TX

Client
City of Houston, Houston Police Department

Architect
Roth Sheppard Architects
Denver, CO
Design Principal
Jeff Sheppard, AIA
Project Architect
Kelly Smith, AIA, LEED AP

Associate Architect/LEED
RdlR Architects
Houston, TX
Principal
Lorie Westrick, AIA, LEED AP
Project Manager
Daniel Ortiz, LEED AP

Structural Engineer
Ingenium

MEP/FP Engineer
Henderson Engineers

Landscape Architect
Asakura Robinson

Civil Engineer
Kuo and Associates

Cost Estimating
Gilbane

Site Area
119,615 sf

Building Area
29,018 sf

Main entrance exterior

What were the circumstances of receiving the commission for this project?

We responsed to a Request for Proposals (RFP).

Main hallway

Can you describe your design process for the building?

The new, single-story 29,000-square-foot Fondren Police Station includes a public lobby, a large public meeting room, and patrol, investigations and locker functions. The station was designed to comply with the Leadership in Energy and Environmental Design (LEED) standards for Certified Level LEED Certification.

The City of Houston and the Houston Police Department (HPD) were seeking to redefine how the Department’s physical infrastructure is implemented through-out the City. The primary design goal was to establish an adaptable prototype that can be replicated for future stations.

Main entrance with blue light

How does the completed building compare to the project as designed? Were there any dramatic changes between the two and/or lessons learned during construction?

Initially, the client wanted to use prefab modular trailers to meet their budget, square footage and construction schedule needs. We provided a matrix evaluating several different construction methodologies and systems, eventually convincing the client to consider the alternative of a site cast tilt-up construction system and a pre-fabricated
steel structure that could be easily configured to provide the interior functional, volumetric and daylighting needs appropriate to a contemporary police facility.

Site plan

How does the building relate to contemporary architectural trends, be it sustainability, technology, etc.?

The use of off-the-shelf common construction methodologies and materials such as resin-based composite wood decking as sun shading, tilt-up concrete construction and preengineered aluminum canopy systems were incorporated into the project to meet the strict functional and maintenance requirements of HPD while also providing opportunities to visually communicate the core philosophy of the division —“order through law, justice with mercy".

Email interview conducted by John Hill.

Floor plan
Concept diagrams

Houston Police Department South Gessner Division
2011

Houston, TX

Client
City of Houston, Houston Police Department

Architect
Roth Sheppard Architects
Denver, CO
Design Principal
Jeff Sheppard, AIA
Project Architect
Kelly Smith, AIA, LEED AP

Associate Architect/LEED
RdlR Architects
Houston, TX
Principal
Lorie Westrick, AIA, LEED AP
Project Manager
Daniel Ortiz, LEED AP

Structural Engineer
Ingenium

MEP/FP Engineer
Henderson Engineers

Landscape Architect
Asakura Robinson

Civil Engineer
Kuo and Associates

Cost Estimating
Gilbane

Site Area
119,615 sf

Building Area
29,018 sf

Related articles

Other articles in this category