Office Building Oskar

Munich, Germany
Lobby
Fotografia © Fantomas
Light Installation
Fotografia © Fantomas
Reception Desk
Fotografia © Fantomas
Architects
Arnold / Werner
Localització
Oskar-von-Miller-Ring 20, 80333 Munich, Germany
Any
2018
Client
Hines
Equip
Arnold / Werner Architekten
Signaletics and Light Installation
Fantomas

In 2018, A/W redesigned all the public areas at Siemens Headquarters, originally built in 1999 by Richard Meier. The round, 8-metre-high entrance hall now serves as a reception and lobby. The reception desk made of solid Italian Carrara marble and a blue-and-grey-coloured carpet are positioned in the centre of the lobby. Directly above and framed by floor-to-ceiling curtains is a light installation almost 10 metres in diameter with 1,200 stainless-steel interactive LED rods from the design agency Fantomas.

Projectes relacionats

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Revista

Altres projectes per Arnold / Werner

Ferienhaus Urfeld
Urfeld, Germany
Hotel Stay2Munich
München, Germany
Bobbeaman Musicclub
München, Germany
Wohnung Reitmorstraße
München, Germany
Bungalow Germering
München, Germany