Construction of a cycle of orientation in fully

Fully, Suíça
Arquitectos
Lemanarc SA
Ano
2015

Although the two buildings were built in an offset manner, they are still limited. By giving a visual impression of the complete separation of the two buildings, it brings an intimate connection to the central area of ​​the school and provides more space for the venue.

Projetos relacionados

  • The Yas Hotel
    Asymptote Architecture
  • 166 Perry Street
    Asymptote Architecture
  • F & B Pavilion
    A*PT Architecture
  • A. E. Smith School Library
    A*PT Architecture
  • Camera Jewel House
    Tonkin Liu

Revista

Outros projetos por Lemanarc SA

Nanjing Drum Tower Hospital
Nanjing, China
Shanghai Oriental Hosptial
Shanghai, China
Xiamen Wuyuan Bay Hong'ai Hospital
Xiamen, China
Xiamen Nanyang College
Xiamen, China
Different mixe housing,commercial center and services sous-le-bourg a aigle
Aigle, Suíça