Iberia Centre for Contemporary Art
Beijing, China
- 年
- 2008
Project description:
This project is located at 798 art district, Beijing. It is a redevelopment project converting a group of industrial buildings to an integrate art centre.
Project Name: Iberia Centre for Contemporary Art
Location: Beijing
Client: Iberia Centre for Contemporary Art
Architect: Liang Jingyu
Project Team: Peng Xiaohu, Yang Jieqing, Li HongleiZhou Yuan
Structure and Material: Steel Structure with some brick bearing structure
Building Area: 3000 sq.m.
Cost: 9 million RMB
Design Period: August 2007 to May 2008
Construction Period: September 2007 to July 2008
関連したプロジェクト
Magazine
-
Paul Rudolph 101
1 day ago
-
TH House
2 day ago
-
Staying in the City
2 day ago