New construction production and administration…

Lahr, Germany, 2017

The company HEWE is specialized in aluminum window, door and facade systems for architecture and the construction industry. The conceptio...

New construction headquarter AUMA

Müllheim, Germany, 2017

The new AUMA head office in Müllheim / Baden covers a gross floor area (GFA) of 11,500 m². The design planning started in 2011 and was co...

Umnutzung Neutragebäude

Jena, Germany, 2014

Die Aufgabenstellung dieses Projektes sah vor eine leer stehende Industriehalle in Typenbauweise aus Vorwendezeiten in ein modernes und f...

New building Drehmo

Wenden, Germany, 2013

form follows site – In Wenden, the southernmost town of the german region of Sauerland electromechanical actuators for water management, ...

Reconstruction multifunctional building

Jena, Germany, 2012

The task in this project was to remodel an empty production facility, which was built in type design of precast concrete, into a modern, ...

Revitalization of an office building

Müllheim, Germany, 2012

The task of this project was the revitalization of an empty precast concrete office from the 1980`s. After the purchase of the building b...

Conversion and new construction of a production…

Ostfildern, Germany, 2012

Starting with an existing multi-storey building without opportunities of growth, the management decided to acquire acquisition and the pu...

New building assembly- and storagebuilding

Müllheim, Germany, 2012

The assembly and storage building joins a sequence of three equal-sized buildings on the urban master plan, which wurm+wurm has developed...

reconstruction and modification of an office…

Müllheim, Germany, 2010

The challenge of this project was to convert the existing area in the second floor of a building which formerly belonged to the firm Buck...

modification of a development office

Müllheim, Germany, 2010

Since the stock looked very dark, the main focus was the modification of the Development Office at Plant 1 on a relatively small footprin...

Media Centre

Oberkirch, Germany, 2010

The “Media Centre Oberkirch” was decided in 2007 within the scope of a competition by the architecture office Wurm & Wurm for himself. St...

Göpel electronic GmbH

Jena, Germany, 2010

The new construction was realized with an investment volume of 4.9 mio. Euros. The new research and development building is designed for ...

residential building, renovation

Munich, Germany, 2009

Renovation along with increased efficiency of energy of a row house from the 30s in Munich Gern – in planning stage. The building after i...

Sipos Aktorik

Nürnberg, Germany, 2009

Construction of a production hall with service, development and office space, which are directly attached to the production area and link...

GFC Antriebssysteme GmbH

Coswig, Germany, 2009

GFC Antriebssysteme GmbH is looking back at more than 100 years history of developing and manufacturing of worm gear and hydraulic gear u...

Auma Service center

Prague, Czech Republic, 2008

Bada AG

Bühl, Germany, 2007

Construction of a production building and an administration building. The building structure follows the stringent material flow of therm...

Secondary school Bühl

Bühl, Germany, 2005

The object results from the winning of a competition in 1998. The design for secondary school is conceived as a two storied building with...