Administration and delivery section | HMT GmbH | 2016
Photo © Steffen Schrägle
 
 
High proportion of glazing ensures transparency | HMT GmbH
Photo © Steffen Schrägle
 
 
High proportion of glazing ensures transparency | HMT GmbH | 2016
Photo © Steffen Schrägle
 
 
Production – mullion/transom facade with window hinge  | HMT GmbH
Photo © Steffen Schrägle
 
 
Production – mullion/transom facade with window hinge  | HMT GmbH
Photo © Steffen Schrägle
 
 

New Production and Logistics Centre Europe | GEMÜ

 Back to Projects list

City
Steinach
Year
2016

Arburg is one of the world’s leading manufacturers of high-end injection moulding machines for plastics processing. Ensuring the customers success in injection moulding production is part of their day-to-day business. Their decades of experience guarantee a competitive edge. They are expert partner for efficient injection moulding. The ever-increasing number of employees made it necessary to create more parking spaces, which should ideally protect against snow and rain. Different locations for a parking garage were investigated. The location of the parking garage was planned on a lower parking lot to minimize the visual height. As a result of the shift operation, the parking garage is also open at night between 10. p.m. and 06:00 a.m. This required a façade with good protection against noise immissions. It is equipped with a modern, low power consumption LED light concept.

Client
Arburg GmbH + Co. KG, Loßburg

Characteristics
Gross capacity: 53.600 m3
Main usable area: 15.600 m2
Car-parking spaces: 600
Bicycle racks: 50