Light of Internet World Internet Conference Center
Wuzhen, China
- Architects
- Archi-Union Architects
- Year
- 2019
The site is located in the northwest corner of the heart of Wuzhen. The entire site is surrounded by farm houses, tourism projects and the first stage project of the exhibition pavilion area. The layout of the new venues needs to consider the continuity of the space and functions of the existing venues. As the core area of the summit, it also needs to consider the possibility that the entire area will be led by the world's leading Internet technology publishing activities, and the possibility of the future development of intelligent and modern conference and exhibition facilities.
In order to meet the functional requirements of the the Wolrd Internet Conference and future diversified operation requirements; the pavilion is divided into four exhibition halls from south to north. The space can be used separated or merged, so it is possible to be used in series at large exhibitions or it can be opened in parallel to accommodate various activities. Considering the space experience and applicability of the space of the independent exhibition hall, each section of the exhibition halls is high in the center and low along the edge. The string beams are placed in the middle of the exhibition hall to form the big open space for the special function requirement. At the same time, there are openings at the top to introduce the skylight to improve the space quality. There are many successful roof examples that use gravity to create catenary roof structures. In terms of structural economy, suspended roofs with suspension cables or steel strips require lower amount of steel, but the construction control and the detail design of the flexible systems are relatively complicated.
The 20000-square-meter roof consists of 700,000 tiles. Therefore it is merely impossible to construct everything on site. The design uses prefabrication shift from traditional tile work into prefabricated installation unit. Every 18 tiles are combined into one installation unit and then installed onto the roof within only 5 minutes.
Related Projects
Magazine
-
Watching the Shortlist
Today
-
Paul Rudolph 101
1 day ago
-
TH House
2 days ago
-
Staying in the City
2 days ago