Baku Crystal Hall

Baku, Azerbaijan
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Photo © Florian Licht
Lighting Designers
Lichtvision
Location
Baku, Azerbaijan
Year
2012

Just in time for the Eurovision Song Contest 2012, the Baku Crystal Hall - a modern, multi-functional event arena with a capacity of 23,000 spectators - could be completed in a record time of only eight months. The 206-metre-long and 168-metre-wide steel construction is clad with an illuminated membrane facade, which lends the building its characteristic crystalline appearance. During the dark hours the majestic hall’s facade is lit by 5,400 LED RGB light points that make a great visual impact.

Architect
gmp Architekten

Awards
IES Illumination Award of Merit 2013
illumni Infinity Awards 'Bronze' for facade lighting
IES Illumination Awards 2013 – Section Award
LAMP Lighting Solution Awards 13 – Shortlisted: Architectural outdoor lighting

Related Projects

  • Bærum Cultural Center
    Snøhetta
  • Museum of Inuit Art
    gh3
  • Russell Hill Road
    gh3
  • House 60
    gh3
  • Bibliothek der Hochschule für Technik und Wirtschaft
    HerbstKunkler Architekten

Magazine

Other Projects by Lichtvision

Opernturm
Frankfurt am Main, Germany
Cruise Ship AIDAmar
NN
Gallery Building "Germanisches Nationalmuseum"
Nuremberg, Germany
Albertinum
Dresden, Germany
Shopping Mall Forum
Duisburg, Germany
National Stadium Warsaw
Warsaw, Poland