Construction of a cycle of orientation in fully

Fully, Switzerland
Architects
Lemanarc SA
Any
2015

Although the two buildings were built in an offset manner, they are still limited. By giving a visual impression of the complete separation of the two buildings, it brings an intimate connection to the central area of ​​the school and provides more space for the venue.

Projectes relacionats

  • Centillion Sofia
    DIN A4 Architektur
  • Joe and Rika Mansueto Library
    L-Plan Lighting Design
  • Terra Mineralia, Schloß Freudenstein
    L-Plan Lighting Design
  • シャングリ・ラホテル東京
    ワークテクト
  • 日本平ホテル
    ワークテクト

Revista

Altres projectes per Lemanarc SA

Nanjing Drum Tower Hospital
Nanjing, China
Shanghai Oriental Hosptial
Shanghai, China
Xiamen Wuyuan Bay Hong'ai Hospital
Xiamen, China
Xiamen Nanyang College
Xiamen, China
Different mixe housing,commercial center and services sous-le-bourg a aigle
Aigle, Switzerland
Nanjing Public Medical Center
Nanjing, China