South East view, night
Visualització © CORE Architects
South East view, day
Visualització © CORE Architects
Cladding Composite
Fotografia © CORE Architects
Aerial view
Visualització © CORE Architects
Podium, East view
Visualització © CORE Architects
North Entrance
Visualització © CORE Architects
Port Cochere
Visualització © CORE Architects
South Entrance
Visualització © CORE Architects
TTC Subway connection
Visualització © CORE Architects
Podium, North East view
Visualització © CORE Architects
Construction Composite
Visualització © CORE Architects
Site Plan
Visualització © CORE Architects

The Residences of 488 University Avenue

 Torna enrere a la llista de projectes
Localització
488 University Avenue, M5V1P9 Toronto, Canada
Any
2019

This development intensification project includes major enhancements to the existing 18 storey office building by incorporating a striking new facade, exterior skin, and a distinctive and sophisticated three storey podium on one of Toronto’s oldest and grandest boulevards. The project includes the addition of 37 storeys of residential condominiums and shared amenity space above the existing 18 storey office structure. A total of approximately 453 residential units are proposed within a mix of one-bedroom units to three-bedroom family units. Two full floors will be dedicated to 3,251 m2 of shared amenity space. The total area of office space within the existing building is proposed to be retained as part of the development intensification project.

The ground floor of the three storey podium will continue to accommodate retail and service commercial uses accessible from University Avenue. A direct connection to the TTC and St. Patrick subway station has been accommodated in the design. Residents will enjoy a private driveway on Simcoe Street for pickups and drop-offs. The recessed footprint of the existing building enabled the structural engineers to introduce new vertical structural steel columns all along the exterior face of the building on all four exposures that go vertically down to sound rock. These new vertical structure columns surrounding the existing building will support the new residential floors independently of the existing building structure.

There are also new horizontal perimeter steel beams along the face of the existing building exterior and cross bracing to attract the lateral load from the additional residential floors. Long span transfer beams will be utilized in the 20th floor. These transfer beams will distribute the load of the new tower directly to the new vertical steel structure that surrounds the existing building. The new vertical structure will go down to the foundation rock without stressing any of the existing structure. Overall the mixed use project will possess a total gross floor area of approximately 65,021 m2 comprising of 26,306m2. of the existing retained commercial building and 38,714m2 of new residential area

Altres projectes per CORE Architects Inc.

Crosstown
Toronto, Canada
M City - Phase 4
Mississauga, Canada
West Don Lands
Toronto, Canada
12 Degrees
Toronto, Canada
Dockside
Whitby, Canada