Fotografia © Ronald Tilleman
Fotografia © Ronald Tilleman
Fotografia © Tim Snoek
Fotografia © Ronald Tilleman
Fotografia © Ronald Tilleman

Arnhem Central platform coverings

 Torna enrere a la llista de projectes
Localització
Arnhem, Netherlands
Any
2011
Client

ProRail, Utrecht

Data
Gross Roof Area: Approximately 8700 m²
Dimensions: 4 platform roofs of approximately 210 metres long, with varying widths from 9-14 metres
Structure and materials: steel, aluminum and cold formed glass roofs

Use
Platform roofs with integrated elevated footbridge for (high speed) train station

Credits
UNStudio: Ben van Berkel and Caroline Bos with Arjan Dingsté and Marc Hoppermann, Marc Herschel, Derrick Diporedjo, Kirstin Sandner, Rein Werkhoven, René Toet, Sander Versluis

Advisors
Engineering: Movares
Contractor: BAM-Dura Vermeer

Arnhem Central converts several regional routes and high speed trains to Germany. As passenger numbers will continue to grow, the railway infrastructure is being substantially revitalized. On the train station level a new 4th platform will be added and all current platform roofs will be replaced. The design concept for the new platform roofs provides a sense of light and space. Large roof lights, which together with the structural spans, add to a positive experience of the transfer platforms and surroundings. The elevated footbridge is fully integrated in the design, connecting the different platforms with each other and with the north entrance of the train station. The electrified system has also been integrated into the roof structure, giving a uniform appearance across all platforms.

Altres projectes per UNStudio

Fairyland Guorui
Beijing, China
SitTable
The Netherlands, Netherlands
Centre for Virtual Engineering ZVE Fraunhofer Institute
Stuttgart, Germany
The Scotts Tower
Singapore, Singapore
Ringroad
Den Bosch, USA